
HangZhou Tiemeng Metal Structure Co.,Ltd is a expert producer of Prefab Residence,Container House and LigEPT Steel Structure and so forth.Our factory has handed SGS Manufacturing unit Evaluation and ISO9001:2008 Quality Certification.We are hunting EPT to cooperating with you for EPT time period company connection.
Exporting Prefab Container Residence
1.Definition: It is a variety of prefab house which is effortless to transport.
The prime and base are processed in manufacturing unit.
The export flat bundle stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd place dimension:5900*2400*2910mm
2.Attribute: A.It is plank body contructure.
B.Help save the transporation and storage room.
C.Factory preassembly and quick set up.
D.This sort of construction has actions from leaking.
E.Making use of StXiHu (West Lake) Dis.Hu (West Lake) Dis.rdized and modularized creating so that they are simple to arrang and stack up.
F.Using glass wool sandwich panels so that they have numerous great adventures this kind of as:
fireproof,moistureproof,sound insulation,warmth preservation.This design and style is ideal for residing.
G.Total automated powEPTcoating.The process is eco-friendly and air pollution-free.
H.Beautiful Apperance and Envirenmental Security
I.Fast and Easy Disassembly.Recurring Utilization.
three.Software: A.Highway and Railway Construction Internet site
B.Temporary Place of work/Undertaking Division
C.Short term Dormitory
D.Product sales Business office
E.Medical Reception/Emergency Therapy
F.Brief-time period Civil Housing Development
G.the Military Camp
H.the Accomodation for Scientific Analysis.
4.Components: A.Metal Framework Elements as underneath:
1) Column:210*150*2.—three.
2) Top Ring Beam:180*one zero five*two.-three.
three) Bottom Ring Beam:one hundred eighty*one hundred and five*2.-3.
four) Base Purlin:steel sq. tube 100*fifty
five) Prime Purlin:C-sort steel 100*40
B.The wall panel is a type of composite board which is 50mm/75mm rock wool sandwich in between two metal sheets.Its successful width is 950mm.
C.Door : 1950*930
D.Window: 1200*930
E.Ground: Concrete Slab and Plastic Board.
F.the Area of the Leading:Steel Tile
five.Production Approach:
one) Getting Strip Metal
two) Pressing into Column ,Ring Beam and many others.
three) Body Welding
four) Surfacing Coating
five) Floor Masking Installation
six) Thermal Insulating Layer Installation
seven) Electric powered Line Installation
8) Ceiling Installation
nine) Steel Tile Installation
10) Matching Wall Panels .Windows and Doorways
eleven) Matching Connecting Factors
twelve) Transportation
6.Installation Procedure:
A. Utilizing the Crane to Unload
B. Installating the Base
C. Installating the Column
D. Installating the Dowspout Device.
E. Installating the Best
F. Installating the Wall Panels
G. Installating the Home windows and Doors
H. Installating the Electrical Line and Connecting Elements.
I. Adjusting and Completing
FAQ:
Q: Are you a manufacturing facility or investing company?
A:We are a manufacturing unit who have far more than ten many years experience on container houses’ manufacturing.
Q: What is the payment way?
A:T/T ,LC and so on.
Q: What’s your offer capability?
A:Annual Production: container house 72000sets,prefab home 564000square metersportable bathroom 24000sets
steel composition 360000square meters .
Q:How to put in ?
A:We will offer set up instruction and video for you, specialists will be despatched to assist you if it is needed. Nevertheless, the visa charge,
air tickets, lodging,wages will be provided by purchasers.
Q: How EPT is your delivery time?
A:EPTly it is within10-30 daEPT,definitely in accordance to amount and coloration.
Q: How do you guarantee the high quality of the goods?
A:Rigorous item good quality management,top quality can make the long term.This is the tenet of our manufacturing facility.Each merchandise from
our factory has rigid tests procedures, and must be 100% qualitybefore shipping.
Q: How canIget the quotation of the venture ?
A:If you have drawing ,we can offer you you our quotation according to your drawing .

