
Auto Squander Tire Recycling Rubber PowEPTPlant 500kg solHour
1 interval One Hook DebeaEPTLSJ-1200
Structural attributes
The blade of cutter is manufactured of alloy welding and the surface is difficult put on-resisting interval
On safety issue comma this EPT have protective body comma which can efficiently guarantee protection in the process of pulling out wire loop period of time
Motor and EPT comma and as a EPT comma the structure is compact time period
The EPT occupies the EPT ground comma handy installation time period
Use colon
Pulling out the wire loops from the mouth of squander tires time period
2 period Tire Cutter QDJ-1200
The basic principle is colon motor drives hydraulic method and the cylinder comma place the tire to lock arm comma fasten two blades rotating between tire and shear cylinders function to transfer comma two blades rotating blades forming shear comma achieve the impact of shear interval
Attribute colon
This products comma great shear result comma shearing pace comma reduced vitality consumption comma modest quantity comma practical comma due to the fact use the hydraulic program comma simple operation and safe time period
Mechanical description colon the tires more than 800 need to minimize comma and minimize into 4 items in EPT periodthe dimension of piece is two hundred-500mm interval
Notes for utilizing tire cutter colon
a period of time Examine the knives often comma if look evident blunt comma it ought to be maintain timely comma and the service is two-3 many years period of time
b period the oil in hydraulic station must be filtered and changed frequently interval EPTly filter after each and every a single and 50 % 12 months period
c interval Wearing areas colon rubber seals comma shipped with yet another established when ship the EPT to the consumer period of time
three amp4 period of time EPT tire shredEPTZPS-900
Use colon
This EPT can straight crush tires scaled-down than 800mm tires period At the EPT temperature comma can be set directly crushed into 50 ast fifty mm block comma so the following rotating can grind into ten-30 meshes or wire and fiber separation tools period of time
Characteristic colon
This EPT is a compact framework comma advanced technology comma minimal energy intake comma higher performance comma smashing off the check room for the composition comma servicing is notably handy semi resources with carbide surfacing technologies comma high hardness comma high dress in resistance comma and recurring repair using comma so has a EPTer support existence semi rotary display for the lattice framework of metal mesh comma blanking massive spot comma enabling the screening of experienced rubber interval After the partition of huge tires can accomplish the influence of the identical excl
Mechanical description colon the tires of 800mm diameter and rubber ring can straight be damaged into 50 ast50 mm of rubber block period
Notes for using EPT tire shredder colon
a period Inject equipment oil into EPT oil lparhypoid equipment oil rpar comma primary bearings use calcium-based grease lubrication comma three months following the procedure of the EPT comma the oil ought to be replaced and thoroughly clean the gas tank interval Given that then change the oil when time every yr interval
b After offer with three comma000 tons of waste rubber lparin standard situations rpar commathe purchaser must grind the blade slicing edge once time interval The blades is the put on parts comma the EPT provider lifestyle is 5-six several years comma when delivering the EPT to the customer comma the shredEPTwill be outfitted with edge hardness layer patching substance lparelectrodes rpar interval
five period Double Rolls Rubber Crusher XKP-560
Use colon
Largely utilised for crack big rubber blocks into 40-50mm modest rubber blocks time period
Complex parameters colon
Construction colon The rollers adopt alloy chilly hard solid irons with use-resisting comma durable figures period The mill flour is with teeth comma substantial groove interval
In orEPTto increase the support daily life of the cracker comma we recommend construct foundations for rubber cracker interval
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and hard gear floor EPT with reduce noise and EPTer provider life interval
5Our crackers are designed XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with good functioning platforms comma all the wires will be related properly from managing system to motor interval When using the EPT comma the buyers just need to have to join immediately to the EPT time period
squander tyre recycling gear comma Waste tire recycling EPT
| No period of time | Identify | Product | Qty period of time lparQty rpar |
Motor EPT lparKW rpar | ||
| one | Single hook debeader | LSJ-1200 | one | 11 | ||
| 2 | EPT tyre cutter | QDJ-1200 | 1 | five period5 | ||
| 3 amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | 1 | sixty one period5 | ||
| five | Double Rolls Rubber Crusher | XKP560 | 1 | 90 | ||
| 6 | Big conveyor equipment | BCL-8 | 1 | two | ||
| seven | Modest conveyor products | BCL-three | one | 1 period1 | ||
| 8 | Huge Magnet separator | BMS22 | one | 2 period2 | ||
| 9 | Little Magnet separator | SMS-one | 1 | 1 period1 | ||
| 10 | Big Shaking display screen | BSS-eight | one | 7 period5 | ||
| 11 | Little Shaking screen | SSS-3 | one | 3 | ||
| 12 | Fiber separator | FS110 | 1 | five period5 | ||
| thirteen | Wonderful Rubber Powder Pulverizing EPT | XJFS-420 | four | 123 | ||
| Sq. vibrating sieve | 600 | 1 | ||||
| Rubber powder collector | JFS500 | one | seven period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | 1 | period75 | |||
| Screw conveyer | Phi132mm | one | period75 | |||
| Storage pin | one period5cbm | 1 | ||||
| Hopper | 1 | |||||
| Belt conveyer | one | period75 | ||||
| fourteen | Steel Baller EPT | 30T | one | seven period5 | ||
| fifteen | Rubber powder EPT EPT | one | three | |||
| 24 | 334 period4KW | |||||

