
Total Automated Outdated Tyre Recycling to Rubber PowEPTEPT
hydraulic system comma straightforward procedure and risk-free period of time
Mechanical description colon the tires a lot more than 800 need to have to minimize comma and minimize into four items in EPT periodthe size of piece is 200-500mm period
Notes for utilizing tire cutter colon
a interval Examine the knives regularly comma if appear evident blunt comma it need to be sustain well timed comma and the service is 2-3 years interval
b period the oil in hydraulic station should be filtered and transformed routinely time period EPTly filter when each a single and 50 % yr interval
c period Sporting parts colon rubber seals comma shipped with yet another established when ship the EPT to the consumer period
3 amp4 period EPT tire shredEPTZPS-900
Use colon
This EPT can directly crush tires more compact than 800mm tires period At the EPT temperature comma can be set immediately crushed into fifty ast 50 mm block comma so the following rotating can grind into 10-thirty meshes or wire and fiber separation gear interval
Function colon
This EPT is a compact composition comma superior technological innovation comma low strength usage comma high effectiveness comma smashing off the check place for the composition comma servicing is particularly convenient semi equipment with carbide surfacing technological innovation comma high hardness comma higher dress in resistance comma and recurring restore using comma so has a EPTer support lifestyle semi rotary display screen for the lattice framework of metal mesh comma blanking big spot comma enabling the screening of certified rubber period of time Following the partition of large tires can accomplish the impact of the identical excl
Mechanical description colon the tires of 800mm diameter and rubber ring can right be damaged into fifty ast50 mm of rubber block interval
Notes for employing EPT tire shredder colon
a period Inject equipment oil into EPT oil lparhypoid gear oil rpar comma main bearings use calcium-based mostly grease lubrication comma a few months soon after the operation of the EPT comma the oil need to be replaced and clear the gas tank time period Since then alter the oil when time every single yr time period
b Following offer with three comma000 tons of squander rubber lparin standard conditions rpar commathe customer need to grind the blade chopping edge as soon as time period The blades is the dress in areas comma the EPT services life is five-six years comma when delivering the EPT to the buyer comma the shredEPTwill be outfitted with edge hardness layer patching substance lparelectrodes rpar period of time
five interval Double Rolls Rubber Crusher XKP-560
Use colon
Mainly utilised for crack massive rubber blocks into 40-50mm little rubber blocks period
Specialized parameters colon
Framework colon The rollers undertake alloy cold difficult forged irons with put on-resisting comma sturdy figures time period The mill flour is with tooth comma large groove period
In orEPTto prolong the service daily life of the cracker comma we suggest build foundations for rubber cracker period
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and tough gear surface area EPT with decrease noise and EPTer service existence interval
5Our crackers are developed XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with nice operating platforms comma all the wires will be connected effectively from managing system to motor period of time When employing the EPT comma the clients just need to hook up immediately to the EPT time period
Complete Computerized Previous Tyre Recycling to Rubber PowEPTEPT
| No period of time | Name | Model | Qty time period lparQty rpar |
Motor EPT lparKW rpar | ||
| one | One hook debeader | LSJ-1200 | one | 11 | ||
| two | EPT tyre cutter | QDJ-1200 | one | five period5 | ||
| three amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | 1 | 61 period5 | ||
| 5 | Double Rolls Rubber Crusher | XKP560 | 1 | 90 | ||
| six | Huge conveyor equipment | BCL-eight | 1 | 2 | ||
| 7 | Modest conveyor equipment | BCL-three | one | one period1 | ||
| 8 | Large Magnet separator | BMS22 | one | two period2 | ||
| 9 | Tiny Magnet separator | SMS-one | 1 | one period1 | ||
| 10 | Huge Shaking display screen | BSS-8 | 1 | seven period5 | ||
| eleven | Modest Shaking screen | SSS-3 | 1 | 3 | ||
| 12 | Fiber separator | FS110 | 1 | five period5 | ||
| 13 | Good Rubber Powder Pulverizing EPT | XJFS-420 | four | 123 | ||
| Sq. vibrating sieve | 600 | 1 | ||||
| Rubber powder collector | JFS500 | one | 7 period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | 1 | period75 | |||
| Screw conveyer | Phi132mm | 1 | period75 | |||
| Storage pin | 1 period5cbm | 1 | ||||
| Hopper | 1 | |||||
| Belt conveyer | 1 | period75 | ||||
| 14 | Metal Baller EPT | 30T | 1 | 7 period5 | ||
| 15 | Rubber powder EPT EPT | 1 | 3 | |||
| 24 | 334 period4KW | |||||
| No | Name | model | amount | EPT | ||
| EPT tire pre-processing comma you will get lt 50 ast50MM rubber crumb | ||||||
| one | Ring cutter | QQJ-1200 | 1 | five period5KW | ||
| 2 | Loop EPT | YQJ-295 | 1 | 15KW | ||
| three | Strip cutter | QTJ-370 | 1 | five period5 KW | ||
| 4 | Block cutter | QKJ-two hundred | one | eleven KW | ||
| Rubber powder processing colon you will get twenty-thirty mesh rubber powder commaat the same time comma different the fiber and metal wire | ||||||
| five | Tyre crusher | XKP400 | 1 | 45 KW | ||
| XKP450 | 55 KW | |||||
| XKP560 | seventy five KW | |||||
| six | Large conveyor gear | BCL-8 | 1 | 2 KW | period | |
| seven | Little conveyor equipment | BCL-three | 1 | 1 period1 KW | ||
| 8 | Large Magnet separator | BMS22 | one | two period2 KW | ||
| 9 | Small Magnet separator | SMS-one | one | one period1 KW | ||
| 10 | Large Shaking monitor | BSS-8 | 1 | 7 period5 KW | ||
| 11 | Modest Shaking monitor | SSS-3 | period | one | 3 KW | |
| 12 | Fiber Separator | FS110 | one | 11 KW | ||

